Energy Storage

Malaysia has attracted major energy storage manufacturers to set up plants locally. Since 2023, our design work has focused on automation for these facilities, including the EV battery segment.

We cover the manufacturing line from material preparation through pack testing. The stages below describe the processes, the automation we design, and the equipment involved.

Battery manufacturing flow

  1. 1. Raw Material Preparation
  2. 2. Cell Formation Process
  3. 3. Formation and Testing
  4. 4. Module and Pack Assembly
  5. 5. Final Testing and Validation

1. Raw Material Preparation

Automated systems for electrode material mixing, coating solution preparation, and quality control automation.

Processes

  • Electrode material mixing and homogenization
  • Coating solution preparation and quality control
  • Material storage and handling automation
  • Quality assurance and testing

Automation

  • Precision material weighing and mixing
  • Automated quality control systems
  • Continuous monitoring and adjustment
  • Integrated safety protocols

Equipment: Automated Mixing Systems, Quality Control Sensors, Material Handling Robots, Process Control Software

2. Cell Formation Process

Advanced automation for electrode coating, calendering, slitting, and cell assembly processes.

Processes

  • Electrode coating with precision control
  • Calendering for density and surface finishing
  • Slitting and cutting automation
  • Cell assembly and packaging

Automation

  • Precision coating thickness control
  • Automated density optimization
  • High-speed cutting and handling
  • Integrated assembly systems

Equipment: Precision Coating Machines, Automated Calendering, High-Speed Slitting, Robotic Assembly

3. Formation and Testing

Automated formation cycling equipment with capacity testing and comprehensive quality assurance systems.

Processes

  • Formation cycling for cell conditioning
  • Capacity and performance testing
  • Safety validation protocols
  • Quality assurance automation

Automation

  • Controlled formation cycling
  • Automated performance testing
  • Integrated safety validation
  • Real-time quality monitoring

Equipment: Formation Chambers, Testing Equipment, Safety Systems, Quality Control Software

4. Module and Pack Assembly

Robotic systems for cell sorting, automated assembly lines, and thermal-electrical integration.

Processes

  • Cell sorting and matching systems
  • Automated module assembly
  • Thermal management integration
  • Electrical system integration

Automation

  • Intelligent cell matching
  • High-speed robotic assembly
  • Integrated thermal management
  • Automated electrical testing

Equipment: Robotic Assembly Systems, Thermal Management, Electrical Integration, Quality Control

5. Final Testing and Validation

End-of-line testing systems with safety certification and comprehensive data management.

Processes

  • End-of-line performance testing
  • Safety certification automation
  • Data management and traceability
  • Packaging and shipping automation

Automation

  • Comprehensive performance validation
  • Automated safety certification
  • Integrated data management
  • Efficient packaging systems

Equipment: Testing Equipment, Safety Systems, Data Management, Packaging Automation

Typical results

Increased ProductionHigher throughput with automated systems
300%
Quality ImprovementBetter consistency and reduced defects
95%
Cost ReductionLower operational costs per unit
40%
Safety EnhancementEliminated manual handling risks
100%

What we design

Precision engineering

  • High-precision coating systems
  • Micro-meter accuracy control
  • Advanced calibration systems

Quality assurance

  • Real-time monitoring systems
  • Automated defect detection
  • Statistical process control

Safety and compliance

  • Integrated safety protocols
  • Emergency shutdown systems
  • Compliance certification

Scale and changeover

  • Modular system design
  • Capacity expansion
  • Product changeover

Start a project

Tell us the process, throughput, and constraints. We will review feasibility and propose a design.